What will be the nationality of the next human to walk on the Moon?
This question aims to determine the nationality of the next astronaut who will set foot on the lunar surface. This could reflect on the progress and focus of various national space programs. The answer should be based on official announcements and verified sources, considering ongoing and planned lunar missions by different countries.
Forecasted on
Forecast probabilities
- United States: 66.5%
- China: 30.9%
- Other: 2.6%
Reasoning
The United States is the favorite at 66.5%, because it has already flown astronauts around the Moon and officially targets a landing in 2028. China has a substantial 30.9% chance, reflecting NASA’s repeated delays and China’s disciplined path toward a landing before 2030; Other remains at 2.6%, chiefly because an international partner could conceivably take the first step from an Artemis lander.
United States — A real lead attached to an ambitious schedule
The strongest American advantage is not historical prestige but demonstrated capability. Artemis II successfully carried astronauts around the Moon, validating the crewed SLS-Orion system; subsequent inspection also found far less heat-shield damage than on Artemis I [e893, e928]. Engineers have stacked Artemis III’s boosters, while NASA continues investing in spacesuits, lunar transportation, commercial payload services, and a permanent south-pole outpost [e933, e953, e957, e989].
One important fact supersedes older descriptions of Artemis III: it is no longer the planned lunar landing. NASA has converted the 2027 mission into a crewed low-Earth-orbit rehearsal for docking and lander operations, with Artemis IV now designated as the first landing attempt in 2028 and Artemis V offering another opportunity later that year [e918, e919, e923]. This revision is evidence of delay, but the rehearsal also gives NASA a sensible way to expose failures before committing astronauts to a descent.
NASA additionally has two commercial lander pathways, from SpaceX and Blue Origin, and has streamlined their designs and operating concepts [e921, e950]. Starship has demonstrated satellite deployment, an in-space engine restart, and a controlled splashdown, while broader lunar-delivery contracts sustain a large commercial base [e931, e958]. Congressional resistance to major Artemis reductions and explicit political talk of a race with China strengthen the likelihood that schedule problems will attract resources rather than cancellation [e399, e470, e927].
But NASA’s nominal lead should not be mistaken for a dependable two-year cushion. Artemis III was already reported about 90 days behind schedule, and its original landing role was removed because Starship HLS and orbital-refueling technology were not ready [e922, e925]. A crewed landing requires launch vehicles, Orion, docking systems, spacesuits, a lunar lander, and—in SpaceX’s architecture—multiple successful propellant-transfer operations. Space programs often fail on the connections between systems, not on the most visible hardware.
Thus, early 2028 looks more like an aggressive target than the most robust outcome. Still, the United States can slip substantially and remain competitive with China’s later timetable. That combination—a genuine head start, flight-proven crew transport, and serious execution risk—supports 66.5%.
China — The advantage of patience and a simpler architecture
China’s case rests on the proposition that consistency can defeat speed. It has completed a Long March-10 demonstration, two Mengzhou abort tests, and a Lanyue landing-and-takeoff test; a Long March-10B variant has also reached orbit successfully [e892, e929]. These are not yet equivalent to a crewed lunar flyby, but they show that China’s plan has moved beyond aspiration.
Officials have now presented a coherent four-stage campaign: uncrewed testing beginning in 2027, an uncrewed Lanyue mission in 2028, a full landing rehearsal and lunar-orbit docking demonstration in 2029, and a crewed landing before 2030 [e895, e904, e908]. The operational architecture would launch Mengzhou and Lanyue separately on two Long March 10 rockets, dock them in lunar orbit, and send two members of a three-person crew to the surface [e913, e916]. Unlike the leading American Starship concept, this plan does not depend on large-scale orbital propellant transfer.
China also benefits from centralized authority, sustained state prioritization, and a record of methodical execution. Hardware preparation for rehearsal missions, astronaut training, and continued investment indicate that the 2030 objective has institutional weight rather than being merely rhetorical [e940, e944, e990].
The limitation is that China remains behind in operational maturity. The full Long March 10, Mengzhou lunar mission, Lanyue lunar landing, rendezvous sequence, and complete rehearsal must all work in succession. Its published plan deliberately schedules critical uncrewed tests through 2029, leaving little credible route to an early landing if NASA meets even a moderately delayed timetable [e894, e895]. China’s advantage emerges mainly if Artemis IV moves from 2028 into 2030 or beyond.
That possibility is far from remote: NASA has repeatedly redefined and postponed its landing milestone, whereas China’s program has so far appeared steadier. Yet China must execute an entire new crewed-lunar chain of its own. The resulting 30.9% is large enough to reflect a genuine race, but not large enough to erase the American lead.
Other — More likely a crew-order surprise than a third program
No third country currently has an independent program positioned to beat both NASA and China. Russia, India, Japan, Europe, and private operators lack a comparably mature combination of crew spacecraft, heavy-lift launch capability, and lunar lander.
The plausible route to this outcome instead runs through Artemis. Artemis II included Canadian astronaut Jeremy Hansen, demonstrating that international partners can receive prominent crew assignments [e439, e447]. A future Canadian, European, or Japanese astronaut could therefore be assigned to an Artemis surface crew and, by mission procedure or circumstance, become the first person to step outside.
Nevertheless, the political symbolism of America’s return makes it highly likely that a U.S. astronaut—probably the commander—would descend first. China’s announced first-landing plan, meanwhile, appears to involve Chinese taikonauts rather than an international surface crew [e906, e914]. These considerations limit Other to 2.6%.
Why the balance favors Washington without dismissing Beijing
The forecast turns on asymmetric schedule risk. NASA’s official landing date is earlier and its crew transportation system has already completed a lunar flyby, but the commercial lander remains the most difficult and least mature link. China has the later schedule and more unflown systems, yet its simpler architecture and orderly test sequence position it to exploit another major Artemis delay.
The evidence therefore supports a clear but qualified American lead: United States 66.5%, China 30.9%, Other 2.6%. The United States need not hit early 2028 exactly to win, but every additional Artemis slip transfers meaningful probability to a Chinese program designed to reach the surface near the end of the decade.
Cited evidence
- [e893] NASA’s Artemis II mission successfully carried astronauts around the Moon earlier in 2026. [2026] — 2026-11-07T19:04:16.000Z • Rating 5
- [e928] Post-flight inspection found nine areas of char loss on the Artemis II heat shield, compared with 103 on Artemis I; the shield’s ceramic tiles remained uncracked. [2026-04-10] — 2026-11-01T12:19:53.000Z • Rating 5
- [e933] Engineers completed stacking the solid rocket boosters for Artemis III at Kennedy Space Center in Florida. [2026-09] — 2026-11-11T14:58:48.000Z • Rating 4
- [e953] NASA announced its Moon Base Program at Kennedy Space Center, outlining a goal of establishing a permanent crewed outpost at the lunar south pole by the early 2030s. [2026-03] — 2026-11-09T00:14:18.000Z • Rating 4
- [e957] NASA awarded six lunar transportation task orders worth approximately $1.3 billion combined to Arrow Science and Technology, Blue Origin, and Impulse Space, and increased the maximum value of its existing Commercial Lunar Payload Services contract from $2.6 billion to $4.2 billion. [2026-11-08] — 2026-11-08T08:45:00.000Z • Rating 4
- [e989] NASA announced plans with Axiom Space to develop a lighter “Sortie suit” for astronauts’ initial lunar surface missions. [2026-10-23] — 2026-11-04T20:17:07.000Z • Rating 3
- [e918] NASA announced in October 2026 that Artemis III would test SpaceX and Blue Origin lunar landers and docking systems in low Earth orbit instead of conducting a direct lunar landing. — 2026-10-30T13:02:40.000Z • Rating 5
- [e919] NASA unveiled a revised Artemis 3 mission plan that replaces the planned crewed lunar landing with an orbital testing campaign involving three spacecraft and three heavy-lift rockets. [2026-10-27] — 2026-10-27T12:15:06.000Z • Rating 5
- [e923] NASA presented a revised Artemis schedule at Kennedy Space Center, targeting Artemis III as a crewed Earth-orbit test in 2027, Artemis IV as the first crewed Artemis lunar landing in early 2028, and Artemis V as another landing opportunity later in 2028. [2026-10-23] — 2026-10-25T10:04:26.000Z • Rating 5
- [e921] NASA held an Artemis update and announced that it had streamlined the designs and revised the concepts of operations for future crewed lunar landers being developed by Blue Origin and SpaceX. [2026-10-24] — 2026-10-24T00:30:18.000Z • Rating 5
- [e950] NASA detailed its plans for the Artemis III mission, including demonstrations involving Blue Origin and SpaceX lunar landers, in a published report. [2026-10-28] — 2026-10-28T02:43:34.000Z • Rating 4
- [e931] SpaceX’s Starship Flight 13 delivered demonstration satellites, tested an in-space engine restart, and completed a designated splashdown on July 24, 2026. — 2026-11-01T01:35:15.000Z • Rating 5
- [e958] NASA announced that SpaceX, Blue Origin and six other aerospace companies are eligible to compete for up to $10 billion in lunar delivery contracts over 10 years under an expanded Commercial Lunar Payload Services framework. [2026-11-07] — 2026-11-08T03:09:40.000Z • Rating 4
- [e399] On April 23, 2026, news reported that members of Congress objected (again) to President Trump's planned NASA budget cuts contained in the FY2027 budget request. [2026-04-23] — 2026-04-23T10:00:00.000Z • Rating 3
- [e470] Congresswoman Zoe Lofgren, in a press release published April 22, 2026, criticized proposed NASA budget cuts and emphasized the importance of space exploration and STEM education funding [2026-04-22] — 2026-04-22T16:27:00.000Z • Rating 3
- [e927] U.S. Transportation Secretary Sean Duffy said the United States was in a race with China to reach the moon. [2026-08] — 2026-10-31T06:45:47.000Z • Rating 5
- [e922] NASA is planning to launch Artemis III in summer 2027, but the exact date is unknown; an internal memo issued approximately one month before October 23, 2026, said the mission was about 90 days behind schedule. [2026-09-23] — 2026-10-24T08:00:54.050Z • Rating 5
- [e925] NASA changed Artemis III from a planned crewed lunar landing to a crewed docking rehearsal in February 2026 because SpaceX’s Starship lunar lander and required in-orbit refuelling technology were not ready. [2026-02] — 2026-10-27T10:33:31.000Z • Rating 5
- [e892] China completed development tests for the Long March-10 rocket, Mengzhou crew spacecraft, and Lanyue lunar lander, including a rocket demonstration, two Mengzhou abort tests, and a Lanyue landing-and-takeoff test in 2026. — 2026-11-10T05:09:25.000Z • Rating 5
- [e929] A Long March-10B rocket completed its maiden flight from the Hainan commercial space launch site, placing its satellite payload into orbit and successfully recovering its first stage through a net-based capture system. [2026-07-10] — 2026-10-18T15:53:00.000Z • Rating 5
- [e895] Chinese space officials presented a plan for human lunar exploration at the 7th Manned Space Symposium in Beijing, including an uncrewed Lanyue lander mission in 2028 and a full uncrewed landing rehearsal in 2029. [2026-10-31] — 2026-11-07T16:19:17.000Z • Rating 5
- [e904] Chinese space officials unveiled a timeline for landing astronauts on the Moon before 2030, including uncrewed tests beginning in 2027 and a lunar-orbit docking demonstration in 2029. [2026-11-03] — 2026-11-03T16:28:26.000Z • Rating 5
- [e908] China presented a four-mission schedule for a crewed Moon landing before 2030 at the 7th Manned Space Academic Conference at Beihang University. [2026-10-31] — 2026-11-02T19:49:12.000Z • Rating 5
- [e913] Wang Xiang announced China’s “two launches, lunar orbit rendezvous” crewed Moon-landing architecture at the 7th Manned Space Symposium in Beijing; two Long March 10 rockets will separately launch the Mengzhou crew spacecraft and Lanyue lander, which will dock in lunar orbit. [2026-10-31] — 2026-11-01T14:42:12.000Z • Rating 5
- [e916] China announced that its crewed lunar landing plan will use two Long March 10 launches: one carrying the Mengzhou crew spacecraft and the other carrying the Lanyue lander, followed by docking in lunar orbit; the China Manned Space Agency aims to land two astronauts before 2030. [2026-10-31] — 2026-11-01T13:35:26.000Z • Rating 5
- [e940] By November 1, 2026, China had conducted Mengzhou launch-abort tests, Lanyue landing and ascent tests, and a low-altitude demonstration test of the Long March 10 rocket. [2026-11-01] — 2026-11-01T21:04:43.000Z • Rating 4
- [e944] China selected two taikonauts who are undergoing training for a planned manned Moon mission [2026] — 2026-11-01T01:08:16.000Z • Rating 4
- [e990] Videos circulated on Chinese social media showing hardware for a planned lunar rehearsal mission being unloaded at China's Wenchang spaceport. [2026] — 2026-11-04T07:10:35.000Z • Rating 3
- [e894] Chinese officials outlined a four-stage plan for a crewed Moon landing before 2030 at the Seventh Manned Spaceflight Conference in Beijing. [2026] — 2026-11-05T23:02:28.000Z • Rating 5
- [e439] Four astronauts — NASA's Reid Wiseman, Victor Glover and Christina Koch, and the Canadian Space Agency's Jeremy Hansen — lifted off from Kennedy Space Center in Florida on 2026-04-02 to attempt a crewed lunar flyby as part of the Artemis II mission; this is the first crewed moon mission since 1972. [2026-04-02] — 2026-04-02T00:08:45.805Z • Rating 4
- [e447] NASA launched four astronauts to space, beginning a landmark lunar-bound mission that will take them closer to the Moon's surface than anyone has been in more than 50 years. [2026-04-01] — 2026-04-02T00:44:25.000Z • Rating 4
- [e906] Chinese state media reported that the planned mission will send the Mengzhou crewed spacecraft and Lanyue lunar lander separately to the Moon, with three astronauts aboard; two are expected to land while the third remains in lunar orbit. [2026-11-01] — 2026-11-02T20:08:24.000Z • Rating 5
- [e914] China stated a goal of landing astronauts on the Moon before 2030, with three astronauts flying, two descending to the lunar surface, and one remaining in lunar orbit aboard Mengzhou. [2026-10-31] — 2026-11-01T14:42:12.000Z • Rating 5
- [e897] NASA announced plans to accelerate the Artemis program toward a crewed lunar landing in 2028, with Artemis III scheduled as an uncrewed or test-focused low-Earth orbit mission in 2027 and Artemis IV designated for the crewed landing. [2026-10-23] — 2026-11-07T19:53:25.000Z • Rating 5
- [e898] NASA announced on November 4, 2026, that it was targeting an Artemis III test flight in 2027 and an Artemis IV lunar landing in 2028. [2026-11-04] — 2026-11-05T18:40:52.000Z • Rating 5
- [e924] NASA announced on October 23, 2026, that Artemis III will fly four astronauts to low Earth orbit in 2027 to test systems for future lunar landings, while Artemis IV remains targeted as the first crewed lunar landing mission in 2028. [2026-10-23] — 2026-10-24T00:22:06.000Z • Rating 5
- [e936] China's Long March 10 rocket, Mengzhou spacecraft, and Lanyue lunar lander were undergoing development and testing as of the article's publication in 2026. [2026-11-04] — 2026-11-04T15:29:00.000Z • Rating 4
- [e947] China completed Mengzhou zero-height abort and escape tests, a Lanyue landing-and-takeoff test, and low-altitude validation of the Long March-10 rocket as development of the crewed lunar-landing vehicles progressed. [2026] — 2026-11-01T03:54:53.000Z • Rating 4
- [e896] China announced details of its plan to land astronauts on the Moon before 2030, including two Long March 10 launches carrying a three-person Mengzhou spacecraft and a Lanyue lunar lander. [2026] — 2026-11-05T19:32:00.000Z • Rating 5
- [e905] China presented a technical plan for its first crewed lunar landing, using two Long March-10 launches and a rendezvous in lunar orbit, at the seventh Manned Space Symposium in Beijing. [2026-10-31] — 2026-11-02T20:08:24.000Z • Rating 5
- [e951] NASA presented a detailed concept of operations for the Artemis III lunar-lander test flight at the Kennedy Space Center on October 23, 2026. [2026-10-23] — 2026-10-24T08:00:54.050Z • Rating 4
- [e955] NASA officials confirmed that the Artemis III Space Launch System core stage and solid rocket boosters had been stacked vertically inside the Vehicle Assembly Building at Kennedy Space Center. [2026-10-28] — 2026-10-29T10:45:38.000Z • Rating 4
- [e902] At the 7th Manned Space Symposium in Beijing, Wang Xiang presented China's plan to land three astronauts, including two on the lunar surface, before 2030. [2026] — 2026-11-04T07:10:35.000Z • Rating 5
- [e910] China presented a crewed Moon-landing plan in Beijing involving separate launches of the Lanyue lunar lander and Mengzhou crewed spacecraft, followed by docking in lunar orbit and transfer of astronauts to the lander. [2026-11-01] — 2026-11-01T21:04:43.000Z • Rating 5
- [e404] The Artemis II mission, a 10-day flight around the moon, launched on April 1, 2026. [2026-04-01] — 2026-05-15T20:37:08.000Z • Rating 3
- [e901] NASA Administrator Jared Isaacman and agency leaders announced updated plans to accelerate the Artemis program, targeting an Artemis III test flight in 2027 and an Artemis IV crewed Moon landing in 2028. [2026-10-23] — 2026-11-04T20:17:07.000Z • Rating 5
- [e912] NASA Administrator Jared Isaacman said at Kennedy Space Center that NASA was accelerating Artemis work while retaining targets for Artemis III in summer 2027 and Artemis IV in 2028. [2026-10-23] — 2026-11-01T19:09:04.000Z • Rating 5
- [e920] NASA officials outlined a revised Artemis mission plan at the Kennedy Space Center, changing Artemis III into an orbital test flight in which four astronauts will practice docking with Blue Origin’s Blue Ghost and SpaceX’s Starship landers in low Earth orbit. [2026-10-23] — 2026-10-26T08:08:41.000Z • Rating 5
- [a4] Everything you need to know about Nasa's Artemis II mission — BBC • 2026-04-09T13:42:47.000Z
- [a7] China is planning to land people on the Moon — Nature • 2026-04-02T00:00:00.000Z
- [e930] The Artemis II launch shifted GPS position readings by several meters and created two ionospheric disturbances extending about 3,100 miles (5,000 kilometers) east to west across North America. [2026] — 2026-11-05T15:28:10.328Z • Rating 5
- [a10] China Is Going to the Moon by 2030. Here's What's Known ... — RAND • 2025-11-13T00:00:00.000Z
- [e899] Wang outlined China’s plan to conduct a crewed lunar landing by 2030 during the 7th Manned Space Symposium at Beihang University in Beijing, held from October 31 to November 1, 2026. [2026-10-31 to 2026-11-01] — 2026-11-05T09:57:12.000Z • Rating 5
- [e907] Chinese space officials, including lunar exploration program chief designer Wang Xiang, presented a detailed plan for crewed lunar missions at the Seventh Manned Spaceflight Conference in Beijing. [2026-11-02] — 2026-11-02T17:09:13.000Z • Rating 5
- [e909] China detailed its plans for a crewed Moon landing before 2030 at the Seventh Manned Space Symposium in Beijing, a two-day event attended by more than 800 experts and scholars. [2026-10-31 to 2026-11-01] — 2026-11-02T15:56:54.000Z • Rating 5
- [e911] Officials including Wang Xiang presented China’s detailed plan for a crewed Moon landing before 2030 at the Seventh Manned Spaceflight Conference. [2026] — 2026-11-02T18:52:02.000Z • Rating 5
- [e941] NASA Administrator Jared Isaacman announced plans to help Blue Origin develop a lunar lander by finding a way to boost the Orion spacecraft into low-lunar orbit. [2026] — 2026-11-02T18:52:02.000Z • Rating 4
- [e440] NASA sent humans to the Moon for the first time since 1972 [2026-04-02] — 2026-04-02T07:11:44.000Z • Rating 4